Bangladesh
Currently, Chattogram Port handles 98% of international cargo in Bangladesh. Since it is a river port in highly urbanized area and expansion of the port is difficult due to the limited available land space and the shallow depth of river water, construction of Matarbari Port was proposed to provide an alternative port of Chattogram Port having 490 million TEUs container capacity.
The proposed Matarbari Port is situated in Dhalghata Union of Maheshkhali Upazila in Cox's Bazar District and is also situated in approximately 70 km south of Chattogram Port in direct distance. National Highway No.1 (N1) is the nearest national highway to the Matarbari Port but there is no good accessibility to the port from the national highway. Therefore, the Matarbari Port Development Project includes a component of access road construction under Road and Highway Department.
Service
OCT’s graphic team provided video presentation to the client. The Matarbari Port Access Road comprises of two components. One is the 1.6 km long north‐south connector road in Matarbari Port enabling future expansion of the Matarbari Port. and another is the 26.1 km long access road between the Matarbari Port and National Highway No.1. The connecting point with the National Highway No.1 is in Fasiakhali Union of Chakaria Upazila and is approximately 4 km south of Chakaria town center.
Client:
OC GLOBAL – JICA
Services Provided:
Graphic Design, Video Presentation